Everything the site needs.

Construction materials from rebar and waterworks to precast and HVAC, plus temporary fence and site cleanup, for contractors and agencies across California. One certified DVBE site supply company, one call, one invoice.

Priced within one business day. Bid-day requests go first.

What we bring to the jobsite

Material first, with the fence and cleanup that every job needs around it. Order one, or put the whole job on one account.

Construction materials

Rebar, waterworks, storm drain, precast, and mechanical and HVAC equipment. We price it, order it, and have it shipped direct to your site, and you get one invoice from us.

  • Rebar, stock or fabricated to your shop drawings
  • Waterworks pipe, fittings, valves, hydrants, and meters
  • Precast boxes, basins, manholes, and storm drain systems
  • Mechanical and HVAC equipment and parts

Best forRoad, drainage, utility, and building work where you want one vendor to price, order, and track it all. See the full line.

Temporary fence rental

Chain-link panels delivered, set, moved when the work moves, and pulled when you call off-rent.

  • Panels, stands, and swing or rolling vehicle gates
  • Privacy screen, signage, gate locks, and wind ballast
  • Relocations as the site changes, with priority response available
  • Billed every four weeks until you call off-rent, with no fixed term

Best forSite security, public protection, and stormwater and staging perimeters from mobilization to closeout.

Site cleanup

Our own crew cleans the site and consolidates debris into your bins so the site is ready for walkthrough.

  • Final and phase cleanups, priced by crew hours
  • Debris sorted and loaded into your bins or your hauler's containers
  • Punch-list touch-ups before the owner walk

Best forCloseout week, phase turnovers, and punch-list cleanups.

What we supply

The full line. If it goes in the ground, on the site, or on the roof, ask us. Download the line card (PDF) to keep it on file.

Bundles of steel rebar on timber dunnage at a jobsite laydown yard

Rebar & reinforcing

Stock rebar, fabrication to shop drawings, pre-assembled cages and mats, mill certifications available with every delivery.

Stacks of blue C900 PVC and black HDPE pipe in a supply yard

Waterworks

C900/C905 and SDR PVC, Schedule 40 and 80, HDPE, ductile and cast iron, VCP, RCP, and backflow preventers.

Pallet of ductile iron pipe fittings with boxes of bolts and gaskets

Pipe & fittings

Flanged, mechanical joint, push-on, and restrained. Copper and steel press (Viega ProPress), grooved joint (Victaulic), acid waste piping, nuts, bolts, and gaskets.

Blue resilient-wedge gate valves and a yellow fire hydrant on a pallet

Valves, hydrants & meters

Gate, butterfly, plug, check, and ball valves, air release, pressure control, hydrants, meters, and actuation.

Excavator setting a precast concrete utility box into a trench

Precast & structures

Concrete, cast iron, and polymer boxes, catch basins and inlets, manholes, vaults, and HDPE structures.

Corrugated steel culvert under a road embankment with rock slope protection

Storm drain & erosion control

Corrugated steel pipe and culvert, retention and detention systems, geotextiles, and erosion control products.

Packaged rooftop HVAC units and a cooling tower on a commercial roof

Commercial HVAC

Air handling units, fans, cooling towers, VRF systems, replacement parts, and manufacturer submittal data.

Temporary chain-link fence with black privacy screen and sandbagged stands

Temporary fence

Panels, gates, screen, ballast, signage, and locks, delivered, moved as the job moves, and pulled at closeout.

Construction debris consolidated in a roll-off bin beside a swept building site

Site cleanup

Phase and final cleanups by our own crew, with debris sorted and loaded into your bins or your hauler's containers.

One vendor, start to finish

Most jobs need all three at different times. Keep them with one company and one contact instead of three.

Mobilize

Fence and gates go up before the first crew arrives. The perimeter moves with the phasing.

Build

Rebar, pipe, and underground material shipped direct to the site for the dates you need, with the paperwork attached.

Close out

Final cleanup, fence pulled, and a clean site for the owner walk.

For estimators on public bids

Built around bid day: fast numbers, one scope, and the paperwork your submittal needs.

One number per scope

A single price and scope you can drop straight into your bid, with optional add-ons listed separately.

Answers within one business day

Send the plans, bid item list, or takeoff. We'll come back with questions or a price, and bid-day requests go first.

A ready compliance packet

W-9, certificate of insurance, and our DVBE and Small Business certification (#2055806) on request, so your submittal isn't waiting on us.

Certified DVBE and Small Business

DVBE Site Supply is owned and operated by a disabled veteran and is certified by the California Department of General Services as a Disabled Veteran Business Enterprise (DVBE) and a Small Business (SB Micro and SB-PW), certification #2055806, valid through October 31, 2028. We count toward both DVBE and SB participation goals. Because DVBE credit depends on the work we perform on your contract, ask us to confirm in writing which of our services count before you list us.

How ordering works

The same steps for a 400-foot fence line or a full bid package.

  1. Send the requestUse the form below or email your plans, bid item list, or takeoff.
  2. Get our numberA priced quote within one business day, or our questions if something's missing. Bid-day requests go first.
  3. ScheduleTell us the install or delivery date. We confirm it in writing and schedule the crew or the shipment.
  4. Adjust as you goCall for a relocation, an extra gate, or a phase cleanup. Every change is logged and shows on your next invoice.
  5. Close outCall off-rent with three business days' notice. We pull the fence, clean the site, and send the final invoice.

Questions estimators ask

Straight answers. If yours isn't here, ask it in the request form.

Will you count toward my DVBE goal?

Yes. We're a certified DVBE and Small Business with the California Department of General Services (#2055806, valid through October 31, 2028), so we count toward both DVBE and SB participation. We buy, invoice, and deliver the materials ourselves, which is what makes a supplier's participation count. We'll confirm in writing which of our services count on your specific contract before you list us, and you can verify our status on Cal eProcure.

How is fence rental billed?

Rent is billed in advance every four weeks, net 30. Setup is billed at install and removal at pickup. Rent continues until you call off-rent, so you're never paying for a fixed term you don't use.

Can you price from plans or a bid item list?

Yes. Send the plans, the bid item list, or your own takeoff. We'll price every line we supply and tell you what we don't.

Where do you work?

All of California, on public and private work, in every Caltrans district. We're based in Rocklin in Placer County, and materials ship direct to your site anywhere in the state. Tell us where the job is when you ask for a price.

What paperwork comes with materials?

Certificates of compliance and mill certifications on steel, available with every delivery. One invoice from us covers the whole order.

What do you need priced?
Up to 10 files, 100 MB each: PDF, photos, Excel, Word, CSV, ZIP, DWG.
We use your details only to answer this request. We never sell or share them.
Request received.

Local, certified DVBE, and on call

DVBE Site Supply is based in Rocklin and founded by a disabled veteran who wanted to build a company contractors can count on: answer the call, show up when promised, and keep the paperwork straight.

We work with general contractors and their subcontractors on public and private jobs across California. Meet Marcus and the team.

Based inRocklin, Placer County
Service areaAll of California
OwnershipDisabled veteran owned and operated
CertificationsDVBE · SB (Micro) · SB-PW · #2055806